2 MVA UPS POWER BACKUP SYSTEM
GUATEMALA
DESCRIPTION
Anxor Ingeniería executed a comprehensive critical electrical infrastructure project, which involved the construction of a structural mezzanine and the full implementation of a 1250 kVA UPS backup system. The project was specifically designed to ensure operational continuity for high-criticality industrial processes.
TECHNICAL SPECIFICATIONS
- Power Capacity: 1250 kVA
- Location: Chimaltenango, Guatemala
- Sector: Industrial Bakery
- Autonomy/Runtime: 10 minutes
SCOPE OF WORK
- Engineering: Detailed civil and electrical engineering for the construction of the mezzanine housing the power equipment.
- Mechanical Assembly: Positioning and mechanical mounting of the 1250 kVA UPS and its associated systems.
- Electrical Distribution: Installation of Medium Voltage (MV) and Low Voltage (LV) electrical distribution systems.
- Infrastructure: Implementation of power conductors and cable management systems, including cable trays and ducting.
- System Integration: Integration of the battery banks and auxiliary services.
- Retrofitting: Modification and adaptation of existing electrical systems to ensure full compatibility, safety, and optimal performance of the new UPS.
- Climate Control: Coordination and installation of the specialized HVAC (climatization) system for the UPS room.
GALERÍA




Español
English





